Questions
Office & Tenant Improvement Painting: Common Questions
Can you paint our tenant improvement on the GC's schedule?
Yes. The bid is built from the GC's schedule, with our start tied to drywall finish and our exit before flooring, and we work from the GC's weekly look-ahead so a slipped trade moves our dates rather than our quality.
Can an occupied office be repainted without closing it?
Yes. The work runs after hours, on weekends or one zone at a time, with furniture moved and reset each night and low-odour products, so staff arrive to a usable office in the morning.
Do you match a landlord's building standard colors?
Yes. Send the building standard or the existing color schedule and we draw down the specified products for approval, so a new suite matches the corridors and the suites around it.
Who handles drywall repairs before painting?
On a TI the drywall finisher owns the finish level the specification calls for. We prime and paint, flag any area that will show under paint at the walkthrough, and handle small dings and nail pops on a repaint as part of normal prep.
What do you need from us to bid an office job?
The plans or a room list, the finish schedule or building standard, the GC's schedule if there is one, and any building rules for access and protection. A walkthrough of the space follows for an existing office.
Do you send product data and submittals?
Yes. Product data sheets, the color schedule and drawdowns go to the GC or architect for approval before we mobilize, so the products on the wall are the ones that were signed off.
Can you return for touch-ups after the other trades finish?
Yes, and the bid plans for it. Electricians, flooring installers and furniture crews mark walls on their way out, so a touch-up visit after they leave is built into the schedule before the final walk.
Do you paint office building exteriors as well as suites?
Yes. Exterior repaints of office buildings are bid by elevation in the same way, with lift access and entrance phasing planned so tenants and visitors keep using the main doors.
How much notice do you need before a TI painting start?
Enough to clear submittals. Approved product data and colors are what hold a start date, so the sooner the finish schedule reaches us, the sooner our first day can be locked onto the GC's schedule. The start date and expected length are written on the bid.